Expansion of Buksefjorden Hydroelectric Power Plant, Greenland - market dialogue

Expansion of the existing hydroelectric power plant is tendered in one turnkey contract. The contractor will be responsible for both civil and electrical works. A prequalification will be conducted with an expected selection of four contractors. The tender will be conducted through negotiations, with two rounds of bidding expected. information …

CPV: 45251120 Anläggningsarbeten för vattenkraftverk, 31681400 Elkomponenter, 42112200 Vattenturbiner, 45000000 Anläggningsarbete, 45100000 Förberedande anläggningsarbeten, 45111210 Sprängning och tillhörande bergrensning, 45221247 Tunneldrivning, 45251100 Anläggningsarbete för kraftverk, 45315100 Eltekniska installationer, 43310000 Maskiner för väg- och vattenbyggnadsarbeten
Plats för avrättning:
Expansion of Buksefjorden Hydroelectric Power Plant, Greenland - market dialogue
Plats för tilldelning:
Nukissiorfiit
Tilldelningsnummer:

Greenland-Nuuk: Hydro-electric plant construction work

2023/S 082-247161

Periodic indicative notice – utilities

This notice is a periodic indicative notice only

Works

Legal Basis:
Directive 2014/25/EU

Section I: Contracting entity

I.1) Name and addresses
Official name: Nukissiorfiit
National registration number: 18440202
Postal address: Issortarfimmut 3
Town: Nuuk
NUTS code: GL Greenland
Postal code: 3900
Country: Greenland
Contact person: Morten Koldby
E-mail: mkc@nukissiorfiit.gl
Telephone: +299 533836
Internet address(es):
Main address: https://nukissiorfiit.gl
I.1) Name and addresses
Official name: NunaGreen A/S
National registration number: 77744312
Postal address: Imaneq 1A, 8. Postboks 579
Town: Nuuk
NUTS code: GL Greenland
Postal code: 3900
Country: Greenland
Contact person: Hans Ulrik Skifte
E-mail: hus@nunagreen.gl
Internet address(es):
Main address: https://nunagreen.gl/
I.2) Information about joint procurement
The contract involves joint procurement
I.3) Communication
The procurement documents are available for unrestricted and full direct access, free of charge, at: https://nukissiorfiit.gl
Additional information can be obtained from the abovementioned address
I.6) Main activity
Electricity

Section II: Object

II.1) Scope of the procurement
II.1.1) Title:

Expansion of Buksefjorden Hydroelectric Power Plant, Greenland - market dialogue

II.1.2) Main CPV code
45251120 Hydro-electric plant construction work
II.1.3) Type of contract
Works
II.1.4) Short description:

Expansion of the existing hydroelectric power plant is tendered in one turnkey contract. The contractor will be responsible for both civil and electrical works. A prequalification will be conducted with an expected selection of four contractors. The tender will be conducted through negotiations, with two rounds of bidding expected.

information about the market dialogue is inserted in section VI.3).

II.1.5) Estimated total value
Value excluding VAT: 1 800 000 000.00 DKK
II.1.6) Information about lots
This contract is divided into lots: no
II.2) Description
II.2.2) Additional CPV code(s)
31681400 Electrical components
42112200 Hydraulic turbines
45000000 Construction work
45100000 Site preparation work
45111210 Blasting and associated rock-removal work
45221247 Tunnelling works
45251100 Construction work for power plant
45315100 Electrical engineering installation works
43310000 Civil engineering machinery
II.2.3) Place of performance
NUTS code: GL Greenland
II.2.4) Description of the procurement:

The Buksefjord hydropower plant was commissioned in 1993 with two 15 MW units in Power Station 1. In 2008, a third 15 MW unit was added. The hydropower plant uses the water from Kangerluassunnguup Tasersua and supplies Nuuk with energy for light/power and heating. Inatsisartut (the Parliament of Greenland) has instructed Naalakkersuisut (the Government of Greenland) to work on expanding the power supply from the Buksefjord hydropower plant (EM 2019/153). This expansion with the new Power Station 2 (Expansion 2) will increase the current peak output of 3 x 15 = 45 MW by 2 x 27.5 MW = 55 MW to achieve a total maximum power of 100 MW, which is the maximum amount of power that can be handled by the existing transmission lines. As a result, the plant’s net energy where it connects to the city’s grid will increase from 255 GWh/year to an expected maximum capacity of 660 GWh/year of delivered energy. Power Station 2 will be located adjacent to the current power plant and will be connected to the existing tunnel system. A new access tunnel to Power Station 2 will be built parallel to the existing access tunnel. This new tunnel will be used during the construction of Power Station 2 to limit disruption to the operation of Power Station 1 during this phase of the project. Afterwards, the new access tunnel can be used as an additional emergency escape route. With the current hydropower plant (Expansion 1), more water is used than is added by precipitation to the catchment areas. It will therefore be necessary to supply more water by constructing a new 16-km-long transfer tunnel between the lakes Isortuarsuup Tasia (ISTA) and Kangerluarssunnguup Tasersua (KANG). Construction of the transfer tunnel will increase the average available volume of water from 352 million m³ to 1,248 million m³. The transfer tunnel will be blasted from two excavation faces; from the outlet side at KANG and from the inlet side at ISTA. An access tunnel approximately 300 m long will be built parallel to the transfer tunnel and leading to the tunnel shut-off valve chamber. Before work on the tunnel can commence, a construction road must be built from the existing road at KANG to the construction site at the outlet to KANG, and from KANG a connecting road must be made to the construction area at the inlet at ISTA. During Expansion 2, the transfer tunnel will be engineered and sized to allow for the subsequent future construction of a power station between ISTA and KANG (Expansion 3).

Schedule:

Negotiated procedure with prior notice: Period from July 2023 to February 2024.

Contract signing with the winning general contractor: March 2024.

Delivery and commissioning of the expanded power station: 2028.

II.2.14) Additional information
II.3) Estimated date of publication of contract notice:
04/07/2023

Section IV: Procedure

IV.1) Description
IV.1.8) Information about the Government Procurement Agreement (GPA)
The procurement is covered by the Government Procurement Agreement: yes
IV.2) Administrative information

Section VI: Complementary information

VI.3) Additional information:

The market dialogue will be initiated with a virtual information meeting on May 2nd, at 3PM-4PM (GMT+2). We encourage everyone, who might be interested in this tender, to attend the meeting. The purpose of this meeting is to introduce the project and the upcoming tender.

Please send an email to Rasmus Johannsen, rajo@niras.dk for an invite to the meeting.

Afterwards, it will be possible to express interest in another meeting regarding a focused dialogue with potential tenderers regarding the project. This dialogue will both involve topics the contracting authority has identified a need to gain input to and topics the potential tenderer has a need to address. The participants will consist of representatives of the contracting authority and the potential tenderer. The purpose for the contracting authority is to gain insight into what the market can deliver and make the most of the expert knowledge that the market possesses. The purpose of the potential tenderer is to gain further insight into the project and have possible questions answered. These meetings will be held during the period of May 8th to May 12th. It is possible to conduct these meetings virtually. Please send an email to Rasmus Johannsen, rajo@niras.dk .

VI.5) Date of dispatch of this notice:
21/04/2023