Description of modifications
:
Modification CCN1: Formalises the conclusions from the co-engineering between ESA, GMV, and its subcontractors (i.e., HSM and KMF providers) on the DCN G2G-DCN-ESA-SYST-X-50013-x (updated as part of G2 crypto flexibility clause) being officially flow-down through the CISL 1.3 ([AD.2]) that, in addition to making applicable other documents. Some of them also covered by the G2 crypto flexibility clause, and other introducing new requirements which compliance cover either by baseline (i.e. Task#1 and Task#2) or by options that enhance the baseline compliance (i.e. Option#C). Modification CCN3: GCS needs to re-baseline the schedule due to changes to key milestones and delivery dates from G2SA and G2SB due to crypto compliance recovery requested and the new launchers services availability schedule. The total value of the contract indicated in the contract award notice (521882-2023) was 155,461,433.00 EUR (Total value of the procurement: 193,609,183.00 EUR). The total value of the contract consists of the baseline activities (147,851,928.00 EUR), including options M (3,160,588.00 EUR) and N (4,448,917.00 EUR). The options disclosed in Section II.2.11 of the contract award notice were included in the calculation of the “total value of the procurement”. Therefore, the “total value of the procurement” of the contract award notice was 193,609,183.00 EUR. Description of modifications: Modifications CCN1 and CCN3: Value increased by 5,648,109.00 EUR (CCN1) and 44,219,025.00 EUR (CCN3) (Total value of CCN1 and CCN3 including all options= 49,867,134.00 EUR). The “total contract value” is now updated to 205,328,567.00 EUR (while the “total value of the tender”, which includes also the options under Section II.2.11, is 243,476,317.00 EUR). Please note that both the European Commission and EUSPA are qualified as "buyer", as until 15 June 2023 the European Commission was the contracting authority, while as from the mentioned date EUSPA became the new contracting authority.