Construction of road improvement scheme to include new footpaths, on-road segregated cycle lane, 4m wide pedestrian and cycle bridge adjacent to the old Bandon Railway Bridge, eastbound and westbound connections to the Bandon Railway Greenway, bus stops, road carriageway widening to 6m, controlled and uncontrolled crossing facilities, Forge Hill/Pouladuff Road …
CPV: 45233120 Road construction works, 45233000 Construction, foundation and surface works for highways, roads, 45233100 Construction work for highways, roads, 45233140 Roadworks, 45230000 Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork, 45233162 Cycle path construction work, 45233161 Footpath construction work, 45233253 Surface work for footpaths, 45200000 Works for complete or part construction and civil engineering work, 45233294 Installation of road signals, 45233221 Road-surface painting work, 45221111 Road bridge construction work, 45233280 Erection of road-barriers, 45233220 Surface work for roads, 45233125 Road junction construction work, 45233290 Installation of road signs, 45233142 Road-repair works, 45316110 Installation of road lighting equipment