To produce a detailed Conservation Assessment and Method Statement (PSDP) for the upstanding section of the town wall of Drogheda to the east of Featherbed Lane and running between Laurence Street and Bachelor’s Lane. A detailed site-based survey, equivalent to Level 3 of Historic England’s “Understanding Historic Buildings, a Guide to Good Recording Practice”, must be carried out.

To produce a detailed Conservation Assessment and Method Statement (PSDP) for the upstanding section of the town wall of Drogheda to the east of Featherbed Lane and running between Laurence Street and Bachelor’s Lane. A detailed site-based survey, equivalent to Level 3 of Historic England’s “Understanding Historic Buildings, a Guide …

CPV: 71000000 Arkkitehti-, rakennus-, insinööri- ja tarkastuspalvelut
Teloituspaikka:
To produce a detailed Conservation Assessment and Method Statement (PSDP) for the upstanding section of the town wall of Drogheda to the east of Featherbed Lane and running between Laurence Street and Bachelor’s Lane. A detailed site-based survey, equivalent to Level 3 of Historic England’s “Understanding Historic Buildings, a Guide to Good Recording Practice”, must be carried out.
Myöntävä elin:
Louth County Council_381
Myöntämisnumero:
Featherbed Lane Conservation Study

1. Buyer

1.1 Buyer

Official name : Louth County Council_381
Legal type of the buyer : Local authority
Activity of the contracting authority : General public services

2. Procedure

2.1 Procedure

Title : To produce a detailed Conservation Assessment and Method Statement (PSDP) for the upstanding section of the town wall of Drogheda to the east of Featherbed Lane and running between Laurence Street and Bachelor’s Lane. A detailed site-based survey, equivalent to Level 3 of Historic England’s “Understanding Historic Buildings, a Guide to Good Recording Practice”, must be carried out.
Description : To produce a detailed Conservation Assessment and Method Statement (PSDP) for the upstanding section of the town wall of Drogheda to the east of Featherbed Lane and running between Laurence Street and Bachelor’s Lane. A detailed site-based survey, equivalent to Level 3 of Historic England’s “Understanding Historic Buildings, a Guide to Good Recording Practice”, must be carried out. Archaeological and ecological surveys will be carried out as part of the project, including mortar sampling and testing, under archaeological monitoring, but there will be no building work in 2025. The study would inform future applications, applications for Ministerial Consent and the drawing up of tender documents for works over the next few years. The surveys would also map, assess, characterise, describe and present the spaces on either side of the town wall, with particular emphasis on the changes in levels of the steeply-falling ground (there is approximately 10m of a height difference between the two streets). These studies would also inform future efforts to open up access to the town wall, on one or both sides, and to designs for new, potentially-tourism-related uses of these spaces (subject to orderly planning).
Internal identifier : Featherbed Lane Conservation Study

2.1.1 Purpose

Main nature of the contract : Services
Main classification ( cpv ): 71000000 Architectural, construction, engineering and inspection services

2.1.2 Place of performance

Country : Ireland
Anywhere in the given country

2.1.3 Value

Estimated value excluding VAT : 45 000 Euro

2.1.4 General information

Legal basis :
Directive 2014/24/EU

3. Part

3.1 Part technical ID : PAR-0001

Title : Featherbed Lane Conservation Study
Description : To produce a detailed Conservation Assessment and Method Statement (PSDP) for the upstanding section of the town wall of Drogheda to the east of Featherbed Lane and running between Laurence Street and Bachelor’s Lane. A detailed site-based survey, equivalent to Level 3 of Historic England’s “Understanding Historic Buildings, a Guide to Good Recording Practice”, must be carried out. Archaeological and ecological surveys will be carried out as part of the project, including mortar sampling and testing, under archaeological monitoring, but there will be no building work in 2025. The study would inform future applications, applications for Ministerial Consent and the drawing up of tender documents for works over the next few years. The surveys would also map, assess, characterise, describe and present the spaces on either side of the town wall, with particular emphasis on the changes in levels of the steeply-falling ground (there is approximately 10m of a height difference between the two streets). These studies would also inform future efforts to open up access to the town wall, on one or both sides, and to designs for new, potentially-tourism-related uses of these spaces (subject to orderly planning).
Internal identifier : Featherbed Lane Conservation Study

3.1.1 Purpose

Main nature of the contract : Services
Main classification ( cpv ): 71000000 Architectural, construction, engineering and inspection services

3.1.2 Place of performance

Country : Ireland
Anywhere in the given country

3.1.4 Value

Estimated value excluding VAT : 45 000 Euro

3.1.5 General information

This procurement is also suitable for small and medium-sized enterprises (SMEs) : yes

3.1.9 Further information, mediation and review

Review organisation : The High Court of Ireland -
Organisation providing offline access to the procurement documents : Louth County Council_381 -
Organisation receiving requests to participate : Louth County Council_381 -
Organisation processing tenders : Louth County Council_381 -

8. Organisations

8.1 ORG-0001

Official name : Louth County Council_381
Registration number : 381
Department : Louth County Council
Postal address : County Hall, Millennium Centre,
Town : Dundalk
Postcode : A91 KFW6
Country subdivision (NUTS) : Mid-East ( IE062 )
Country : Ireland
Contact point : Brendan McSherry, Heritage Officer
Telephone : 042-9392969
Internet address : https://www.louthcoco.ie
Roles of this organisation :
Buyer
Organisation providing offline access to the procurement documents
Organisation receiving requests to participate
Organisation processing tenders

8.1 ORG-0002

Official name : The High Court of Ireland
Registration number : The High Court of Ireland
Department : The High Court of Ireland
Postal address : Four Courts, Inns Quay, Dublin 7
Town : Dublin
Postcode : D07 WDX8
Country subdivision (NUTS) : Dublin ( IE061 )
Country : Ireland
Telephone : +353 1 8886000
Roles of this organisation :
Review organisation

8.1 ORG-0003

Official name : European Dynamics S.A.
Registration number : 002024901000
Department : European Dynamics S.A.
Town : Athens
Postcode : 15125
Country subdivision (NUTS) : Βόρειος Τομέας Αθηνών ( EL301 )
Country : Greece
Telephone : +30 2108094500
Roles of this organisation :
TED eSender
Notice information
Notice identifier/version : b94c135e-8227-4922-8555-d9959de95296 - 01
Form type : Planning
Notice type : Prior information notice or a periodic indicative notice used only for information
Notice dispatch date : 13/06/2025 18:36 +01:00
Languages in which this notice is officially available : English
Notice publication number : 00389222-2025
OJ S issue number : 114/2025
Publication date : 17/06/2025
Estimated date of publication of a contract notice within this procedure : 14/06/2025