The following are the main elements to the Multi-Party Framework Agreement for Carrying out Roadwork Contracts 2026-30 (less than 1 million): This Framework may involve some of the following work elements: •Installation of ducts, gullies, drainage pipes manholes and chambers •Roadway repairs including potholes(flexible and rigid)•Footway repairs and refurbishment (incld. …
CPV: 45233142 Road-repair works, 45233223 Carriageway resurfacing works, 45233253 Surface work for footpaths, 44115100 Ducting, 44163110 Drainage pipes, 45232450 Drainage construction works, 45232452 Drainage works, 45233162 Cycle path construction work, 45233293 Installation of street furniture, 45233100 Construction work for highways, roads, 45233120 Road construction works, 45233121 Main road construction works, 45233124 Trunk road construction work, 45233125 Road junction construction work, 45233140 Roadworks, 45233141 Road-maintenance works, 45233220 Surface work for roads, 45233150 Traffic-calming works