This project involves the design, construction, and commissioning of a new Solar Photovoltaic Farm to supply 1MVA of renewable energy directly to Ireland West Airport. The initiative supports the airport’s sustainability goals by reducing reliance on grid electricity and lowering carbon emissions. The contract will be delivered under a Design …
CPV: 31100000 Electric motors, generators and transformers, 31121300 Wind-energy generators, 31200000 Electricity distribution and control apparatus, 45200000 Works for complete or part construction and civil engineering work, 45220000 Engineering works and construction works, 45223110 Installation of metal structures, 45232220 Substation construction work, 45315300 Electricity supply installations, 71311000 Civil engineering consultancy services, 71314000 Energy and related services, 71314100 Electrical services, 71320000 Engineering design services