Le projet consiste en la modernisation du terminal 1, avec la réaffectation / réhabilitation de 10 000 m² de locaux dans le bâtiment existant (25 000 m²) et une extension de 17 600 m² dans son prolongement direct à RDC, R1 et R2. L'emprise du projet est aujourd'hui occupée par …
CPV: 45213331 Airport buildings construction work, 45110000 Building demolition and wrecking work and earthmoving work, 45440000 Painting and glazing work, 45262700 Building alteration work, 45262210 Foundation work, 45112500 Earthmoving work, 45223220 Structural shell work, 45261100 Roof-framing work, 45260000 Roof works and other special trade construction works, 45421000 Joinery work, 45421141 Installation of partitioning, 45432130 Floor-covering work, 45442110 Painting work of buildings, 45421146 Installation of suspended ceilings, 45331000 Heating, ventilation and air-conditioning installation work, 45310000 Electrical installation work, 45313100 Lift installation work, 45213316 Installation works of walkways, 45300000 Building installation work