Wicklow County Council proposes to establish and operate a Framework Agreement for transportation and roads-related consultancy services including the provision of Project Supervisor Design Process (PSDP) services and Designer services. All or part of the following services may be required in respect of projects managed by the Transport, Infrastructure Delivery …
Le Projet ALTIVAL déclaré d'utilité publique est un projet de nouvelle voie réservée aux bus qui facilitera leur circulation vers le métro et les RER du secteur. Il traversera les communes de Chennevières-sur-Marne, Champigny-sur-Marne, Villiers-sur-Marne, Bry-sur-Marne et Noisy-le-Grand (Seine-Saint-Denis). Les aménagements seront réalisés dans le prolongement des ceux déjà conçus …
Spår och växelbyte mellan Åmål-Mellerud Projektet innefattar (exkl geodetisk mätning): - 41 km spårbyte - 6 stycken växlar byts ut - ballastrening och bankettrensing på hela sträckan. Se mer information på projektets hemsida: https://www.trafikverket.se/amal-mellerud-spar-vaxelbyte Spår och växelbyte mellan Åmål-Mellerud Projektet innefattar (exkl geodetisk mätning): - 41 km spårbyte - 6 …
Byggledare med projekteringserfarenhet till Trollhätte kanal. Byggledare med projekteringserfarenhet till Trollhätte kanal.
Gegenstand der Leistungen sind die Beratungs- und Sachverständigenleistungen für den Hubschrauberdachlandeplatz und die erforderlichen Abstimmungen mit allen weiteren Planungsbeteiligten für die Baustufe 1. Im Rahmen der Realisierung des Bauvorhabens "Neubau der Krankenversorgung der MHH am Stadtfelddamm Baustufe 1 - KVBS1" sind eine Planungsberatung und -begleitung sowie Sachverständigenleistungen für den Hubschrauberdachlandeplatz …
The Contract comprises the following: • Designing, delivery, building and testing of a TSI approved 25 kV catenary system, including remote control and connection of feeder and return cables, for an operational speed of 250 km/h and for 275 km/h in test situation on the new line across West Funen …
El procedimiento y naturaleza del contrato es de conformidad con la LCSP y los pliegos publicados El procedimiento y naturaleza del contrato es de conformidad con la LCSP y los pliegos publicados
Under the new Lyon-Turin railway link project, TELT company, as a contracting entity, is the public developer in charge of building and managing the cross-border section of the future infrastructure. With a view to implementing Operational Construction Site 12 (CO12) of this project, TELT launched a consultation in 2023 for …
The stretch E6 Megården-Sommerset is the southernmost and the first construction stage of the project E6 Megården-Mørsvikbotn. The works on the E6 Megården-Sommerset include engineering design services for and the construction of an approx. 21.5 km new E6 on the stretch from Megården to Sommerset. The stretches include three tunnels …
Kungälv förvaltar idag runt 100 konstruktionsbyggnader på offentlig plats och i marin miljö. För en god förvaltning krävs inspektioner, underhållsåtgärder samt om- och nybyggnationer för att säkerställa framkomliga miljöer för infrastruktur. Kungälv handlar därför upp konsulttjänster för att säkra detta. Ramavtalet omfattar två områden. Kungälv förvaltar idag runt 100 konstruktionsbyggnader …