This is a market survey/probe (RFI) where the purpose is to identify possible services, systems and cost that tenderers can deliver for the construction of a wind turbine at Åna prison. Statsbygg has limited experience with such projects and is therefore seeking information before any tender process. This is a …
In order to further accelerate the process of site designation for Offshore Renewable Energy, the Government (through a memo for information in April 2025) signalled its intention that a single National ORE DMAP was the optimal choice for efficient delivery of Ireland’s offshore wind energy needs. The goal of this …
The supply of a paired vertical axis wind turbine to be deployed in conjunction with a hybrid energy system to be deployed at a site in Co. Galway. The supply of a paired vertical axis wind turbine to be deployed in conjunction with a hybrid energy system to be deployed …
The supply of a paired vertical axis wind turbine to be deployed in conjunction with a hybrid energy system to be deployed at a site in Co. Galway. The supply of a paired vertical axis wind turbine to be deployed in conjunction with a hybrid energy system to be deployed …
Notice of Magnet Joint Qualification System (JQS), a portal for supplier qualification and which is used by buyer organisations and all operators in the energy industry to search for, assess and qualify suppliers in accordance with their respective qualification and procurement requirements. Magnet JQS is operated by Offshore Qualific, https://offshorequalific.no/en/, …
Notice of Magnet Joint Qualification System (JQS), a portal for supplier qualification and which is used by buyer organisations and all operators in the energy industry to search for, assess and qualify suppliers in accordance with their respective qualification and procurement requirements. Magnet JQS is operated by Offshore Qualific, https://offshorequalific.no/en/, …