Market Dialogue on Three Core Processes for Future Market System at Energinet

As hydrogen infrastructure is expected to be established in Denmark, there is a need for a market system that can support three key market management processes. At the same time, the existing methane infrastructure will need to be supported by a new system solution. Nomination – The shipper informs Energinet …

CPV: 48100000 Industry specific software package, 72000000 IT services: consulting, software development, Internet and support, 72210000 Programming services of packaged software products
Place of execution:
Market Dialogue on Three Core Processes for Future Market System at Energinet
Awarding body:
Energinet Gastransmission A/S
Award number:
763547

1. Buyer

1.1 Buyer

Official name : Energinet Gastransmission A/S
Legal type of the buyer : Public undertaking
Activity of the contracting entity : Production, transport or distribution of gas or heat

2. Procedure

2.1 Procedure

Title : Market Dialogue on Three Core Processes for Future Market System at Energinet
Description : As hydrogen infrastructure is expected to be established in Denmark, there is a need for a market system that can support three key market management processes. At the same time, the existing methane infrastructure will need to be supported by a new system solution. Nomination – The shipper informs Energinet of the desired transportation quantity for a given time period as the basis for matching and balancing. Nominations and renominations are expected to be submitted at 15-minute intervals. Matching – Ensuring that transported quantities are aligned between two system operators with corresponding opposite values. Allocation – Ensuring correct allocation of physical measurements and the commercial outcome of matching as the basis for balance calculation and system management. A similar need exists for methane, as the intention is to harmonize the systems for methane and hydrogen. The purpose of this Request for Information (RFI) is to identify available software solutions in the market that can support the processes described above. Energinet wishes to explore whether standard systems are available that can be configured to support both methane and hydrogen in separate instances with different configurations. The solution is expected to comply with applicable EU rules for the transportation of methane and hydrogen. At present, the following regulations and network codes are relevant: The Danish Gas Supply Act and EU Regulation 2024/1789 Balancing NC | ENTSOG ( https://www.entsog.eu/balancing-nc) Interoperability and Data Exchange NC | ENTSOG ( https://www.entsog.eu/interoperability-and-data-exchange-nc) Timeline: RFI to be issued in mid-July Deadline for questions: 31 August RFI expected to be completed by 7 September Deadline for questions: 31 August Deadline for answers to questions: 7 September The market dialogue is expected to begin in week 37 via Microsoft Teams. The expected meeting duration is two hours. Implementation and go-live must be completed by the end of June 2029. Description of the procurement: Energinet is exploring the possibility of procuring a market system that can support key business processes related to the operation and development of a hydrogen market. The system must also support the existing methane market. It is expected to handle and support market processes such as nomination, matching and allocation, as well as data exchange between relevant market participants and internal and external systems. The procurement is expected to cover an overall solution capable of supporting both functional and technical needs, including configuration, integration, testing, implementation, documentation, operations, support and ongoing maintenance. It has not yet been determined whether the solution should be based on a standard solution, a configurable platform, custom development or a combination of these. Energinet’s preference is to make maximum use of standard and configurable functionality. Through the market dialogue, Energinet wishes to obtain market input on possible solution models, delivery approaches, implementation processes, dependencies, risks and commercial conditions. This input will be used to qualify the further work on requirements, scope, timeline and a potential tender strategy. After 7 September, Energinet expects to select 3-5 suppliers to be invited to participate in dialogue meetings starting in week 37. Energinet would appreciate receiving answers to the following questions by 31 August: 1.Product maturity •Are genuine standard solutions available for nomination, matching and allocation? •Which TSOs or markets currently use the solution? 2.Adaptation to Danish conditions •To what extent can configuration be carried out without code changes? •What level of adaptation is expected in relation to Danish market rules and the balancing model? •Which parts of the solution are typically customer-specific? 3.Changes to market rules •How are changes to market rules handled after go-live? •Can such changes be handled through configuration, or do they require development? •What are the typical implementation timelines for rule changes? 4.Architecture and critical logic •Where is the logic for balancing, cut-off, validation and allocation located? •Can critical logic be separated from the standard system? 5.Implementation and timeline •What would be a realistic implementation period for a solution of this type? •What are considered the greatest risks to achieving go-live in July 2029? 6.Deployment and platform •Can the solution run on-premises? •Can the solution run in a private cloud? •Can the solution run in a public cloud? •Are there any functional differences between the deployment models? 7.Hydrogen and methane •Does the solution support both hydrogen and methane? •Can different market rules for hydrogen and methane be handled through configuration? •Can a single installation support both gas types simultaneously? •How are diverging regulatory frameworks for hydrogen and methane markets handled? Energinet would appreciate receiving your available time slots for participation in a Teams meeting in week 37, 38 or 39 (7 to 25 September) Please communicate via the tender platform Comdia
Internal identifier : 763547

2.1.1 Purpose

Main nature of the contract : Services
Main classification ( cpv ): 72000000 IT services: consulting, software development, Internet and support
Additional classification ( cpv ): 48100000 Industry specific software package
Additional classification ( cpv ): 72210000 Programming services of packaged software products

2.1.2 Place of performance

Country : Denmark
Anywhere in the given country

2.1.4 General information

Legal basis :
Directive 2014/25/EU

3. Part

3.1 Part : PAR-0000

Title : Market Dialogue on Three Core Processes for Future Market System at Energinet
Description : As hydrogen infrastructure is expected to be established in Denmark, there is a need for a market system that can support three key market management processes. At the same time, the existing methane infrastructure will need to be supported by a new system solution. Nomination – The shipper informs Energinet of the desired transportation quantity for a given time period as the basis for matching and balancing. Nominations and renominations are expected to be submitted at 15-minute intervals. Matching – Ensuring that transported quantities are aligned between two system operators with corresponding opposite values. Allocation – Ensuring correct allocation of physical measurements and the commercial outcome of matching as the basis for balance calculation and system management. A similar need exists for methane, as the intention is to harmonize the systems for methane and hydrogen. The purpose of this Request for Information (RFI) is to identify available software solutions in the market that can support the processes described above. Energinet wishes to explore whether standard systems are available that can be configured to support both methane and hydrogen in separate instances with different configurations. The solution is expected to comply with applicable EU rules for the transportation of methane and hydrogen. At present, the following regulations and network codes are relevant: The Danish Gas Supply Act and EU Regulation 2024/1789 Balancing NC | ENTSOG ( https://www.entsog.eu/balancing-nc) Interoperability and Data Exchange NC | ENTSOG ( https://www.entsog.eu/interoperability-and-data-exchange-nc) Timeline: RFI to be issued in mid-July Deadline for questions: 31 August RFI expected to be completed by 7 September Deadline for questions: 31 August Deadline for answers to questions: 7 September The market dialogue is expected to begin in week 37 via Microsoft Teams. The expected meeting duration is two hours. Implementation and go-live must be completed by the end of June 2029. Description of the procurement: Energinet is exploring the possibility of procuring a market system that can support key business processes related to the operation and development of a hydrogen market. The system must also support the existing methane market. It is expected to handle and support market processes such as nomination, matching and allocation, as well as data exchange between relevant market participants and internal and external systems. The procurement is expected to cover an overall solution capable of supporting both functional and technical needs, including configuration, integration, testing, implementation, documentation, operations, support and ongoing maintenance. It has not yet been determined whether the solution should be based on a standard solution, a configurable platform, custom development or a combination of these. Energinet’s preference is to make maximum use of standard and configurable functionality. Through the market dialogue, Energinet wishes to obtain market input on possible solution models, delivery approaches, implementation processes, dependencies, risks and commercial conditions. This input will be used to qualify the further work on requirements, scope, timeline and a potential tender strategy. After 7 September, Energinet expects to select 3-5 suppliers to be invited to participate in dialogue meetings starting in week 37. Energinet would appreciate receiving answers to the following questions by 31 August: 1.Product maturity •Are genuine standard solutions available for nomination, matching and allocation? •Which TSOs or markets currently use the solution? 2.Adaptation to Danish conditions •To what extent can configuration be carried out without code changes? •What level of adaptation is expected in relation to Danish market rules and the balancing model? •Which parts of the solution are typically customer-specific? 3.Changes to market rules •How are changes to market rules handled after go-live? •Can such changes be handled through configuration, or do they require development? •What are the typical implementation timelines for rule changes? 4.Architecture and critical logic •Where is the logic for balancing, cut-off, validation and allocation located? •Can critical logic be separated from the standard system? 5.Implementation and timeline •What would be a realistic implementation period for a solution of this type? •What are considered the greatest risks to achieving go-live in July 2029? 6.Deployment and platform •Can the solution run on-premises? •Can the solution run in a private cloud? •Can the solution run in a public cloud? •Are there any functional differences between the deployment models? 7.Hydrogen and methane •Does the solution support both hydrogen and methane? •Can different market rules for hydrogen and methane be handled through configuration? •Can a single installation support both gas types simultaneously? •How are diverging regulatory frameworks for hydrogen and methane markets handled? Energinet would appreciate receiving your available time slots for participation in a Teams meeting in week 37, 38 or 39 (7 to 25 September) Please communicate via the tender platform Comdia
Internal identifier : 763547

3.1.1 Purpose

Main nature of the contract : Services
Main classification ( cpv ): 72000000 IT services: consulting, software development, Internet and support
Additional classification ( cpv ): 48100000 Industry specific software package
Additional classification ( cpv ): 72210000 Programming services of packaged software products

3.1.2 Place of performance

Country : Denmark
Anywhere in the given country

3.1.3 Duration

Start date : 17/07/2026
Duration end date : 30/09/2026

3.1.5 General information

Reserved participation : Participation is not reserved.
The procurement is covered by the Government Procurement Agreement (GPA) : yes

3.1.7 Terms of procurement

The execution of the contract must be performed within the framework of sheltered employment programmes : No

3.1.8 Techniques

Framework agreement :
No framework agreement
Information about the dynamic purchasing system :
No dynamic purchase system

3.1.9 Further information, mediation and review

Review organisation : Danish Complaints Board for Public Procurement
Organisation providing additional information about the procurement procedure : Energinet Gastransmission A/S
Organisation providing more information on the review procedures : Danish Competition and Consumer Authority

8. Organisations

8.1 ORG-0001

Official name : Energinet Gastransmission A/S
Registration number : 39315084
Postal address : Tonne Kjærsvej 65
Town : Fredericia
Postcode : 7000
Country subdivision (NUTS) : Sydjylland ( DK032 )
Country : Denmark
Contact point : Kirsten Ebstrup
Telephone : 70102244
Internet address : https://energinet.dk/
Roles of this organisation :
Buyer
Organisation providing additional information about the procurement procedure

8.1 ORG-1000

Official name : Comdia ApS
Registration number : 33501404
Postal address : Lindvedvej 71
Town : Odense S
Postcode : 5260
Country subdivision (NUTS) : Fyn ( DK031 )
Country : Denmark
Telephone : +45 7199 3672
Internet address : https://www.comdia.com/
Roles of this organisation :
TED eSender

8.1 ORG-1001

Official name : Danish Complaints Board for Public Procurement
Registration number : 37795526
Postal address : Danish Appeals Boards Authority, Toldboden 2
Town : Viborg
Postcode : 8800
Country subdivision (NUTS) : Vestjylland ( DK041 )
Country : Denmark
Telephone : +45 7240 5600
Internet address : http://www.klfu.dk
Roles of this organisation :
Review organisation

8.1 ORG-1002

Official name : Danish Competition and Consumer Authority
Registration number : 10294819
Postal address : Carl Jacobsens Vej 35
Town : Valby
Postcode : 2500
Country subdivision (NUTS) : Byen København ( DK011 )
Country : Denmark
Telephone : +45 4171 5000
Internet address : https://www.kfst.dk/
Roles of this organisation :
Organisation providing more information on the review procedures

Notice information

Notice identifier/version : 0479d785-0f7f-4874-aefe-2014d4b01d8a - 01
Form type : Planning
Notice type : Prior information notice or a periodic indicative notice used only for information
Notice dispatch date : 17/07/2026 14:39 +02:00
Languages in which this notice is officially available : English
Notice publication number : 00500706-2026
OJ S issue number : 137/2026
Publication date : 20/07/2026