Page 1 of 1
Taking out rock at Solgård Avfallsplass - concession contract
In order to increase landfill capacity, there is a need to take out rock in the area at Solgård Avfallsplass. MOVAR would like to enter into a contract with the tenderer (in some documents referred to as the 'contractor') the right to take out rock (rocks/masses). The total amount that …
CPV: 45200000 Works for complete or part construction and civil engineering work, 14000000 Mining, basic metals and related products, 45000000 Construction work, 45100000 Site preparation work, 45250000 Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry, 45254000 Construction work for mining and manufacturing
Page 1 of 1