Prior information notice and hearing of requirement specifications: pipetting robots to the Clinic for laboratory medicine in the Life Science Building.
In 2027, parts of the Clinic for laboratory medicine (KLM) at Oslo University Hospital are moving into Norway's largest and most advanced research and innovation building – the Life Science Building. The Life Science Building is one of the five development projects that are part of the development of the …
CPV: 38000000 Laboratory, optical and precision equipments (excl. glasses), 38400000 Instruments for checking physical characteristics, 38430000 Detection and analysis apparatus, 38434000 Analysers, 38434500 Biochemical analysers