Se adoptará un procedimiento abierto, en aplicación del artículo 156 y siguientes LCSP. Este procedimiento asegura libre concurrencia y publicidad. Se adoptará un procedimiento abierto, en aplicación del artículo 156 y siguientes LCSP. Este procedimiento asegura libre concurrencia y publicidad.
The scope includes a biomass-fired steam boiler as a complete function based on fluid bed technology (CFB or BFB) of approximately 110 MW thermal load with preliminary steam data of 80 bar(g) and 500°C The scope includes a biomass-fired steam boiler as a complete function based on fluid bed technology …
Scopul acestei proceduri de atribuire este furnizarea Upgrade-ului sistemulului VEBTVS100 detinut de autoritatea contractanta, upgrade ce consta in amplasarea a 3 turbopompe adiționale în puncte cheie, integrarea lor în sistemul actual și scăderea conductantei în regim molecular între sistemul VEBTVS100 și sistemul de transport fascicul. În temeiul prevederilor art. 160 …
1. Przedmiotem zamówienia jest wykonanie robót budowlano-montażowych dla zadania „Budowa stacji GPZ Tomaszkowo”. W zakres budowy stacji GPZ Tomaszkowo wchodzą m.in.: budowa budynku stacyjnego wraz z wyposażeniem budowlano-instalacyjnym tj. szafy potrzeb własnych, urządzenia techniczne w postaci rozdzielnicy 15kV oraz baterii akumulatorów, instalacje wodociągowe, kanalizacji sanitarnej, wentylacji, klimatyzacji, ogrzewania, gniazd wtyczkowych, …
Ydelserne består primært af: • montage og afprøvning af relæbaserede sikringsanlæg • montage og afprøvning af gruppebaserede sikringsanlæg • ombygning af sikringsanlæg som konsekvens af udvekslede sporskiftedrev • ombygning af overkørsler som konsekvens af nye overkørselsanlæg • ombygning af linjeblokke som konsekvens af tilslutning mellem et eksisterende sikringsanlæg og nye …
The scope includes a complete installation of fuel handling system on existing fuel yard. The scope includes a complete installation of fuel handling system on existing fuel yard.
The scope includes system for flue gas cleaning, flue gas condensation and water treatment as a complete function. The scope includes system for flue gas cleaning, flue gas condensation and water treatment as a complete function.
Messgeräte faseroptische Erfassungssystem einschließlich des Interrogators, der Verstärker und Software für die kontinuierliche Messung von Dehnung und Temperatur während des TOUGH-Projekts
Op bepaalde momenten in het project, en afhankelijk van de voortgang van het ontwerp van de verschillende racks in de Geautomatiseerde Testfaciliteit (ATF), is de hulp van een elektrotechnicus nodig. Zijn belangrijkste taak is het assembleren van schakelkasten volgens de plannen van de ontwerper van de racks en het helpen …
The Contract comprises the following: • Designing, delivery, building and testing of a TSI approved 25 kV catenary system, including remote control and connection of feeder and return cables, for an operational speed of 250 km/h and for 275 km/h in test situation on the new line across West Funen …