The procurement shall cover the contracting authority ́s need for consultancy services in the following disciplines: • Planning and building applications • Landscape architect (LARK) For planning and building applications, the framework agreement can include the following contract works: consultancy, detailed engineering design services, review and overall planning within planning …
With this competition, a contract will be signed for the construction management assignment for two of MOVAR's ongoing projects: • New Fuglevik Treatment Facility (RA) also in short form referred to only as "FRA", and • New transfer facility from Brevik and Kambo to Fuglevik Both projects are included in …
Control y vigilancia de la obra: 33-AL-4880 mejora de la travesía N-340A a su paso por la curva, Adra. Provincia de Almería Control y vigilancia de la obra: 33-AL-4880 mejora de la travesía N-340A a su paso por la curva, Adra. Provincia de Almería
Servicios de Redacción de los proyectos de trazado y construcción de la duplicación de calzada de la carretera M-121. tramo A-2 (Alcalá de Henares) – Meco. SC-A-0009-2025-S Servicios de Redacción de los proyectos de trazado y construcción de la duplicación de calzada de la carretera M-121. tramo A-2 (Alcalá de …
Mini Competition for Site Engineer Services for River Poddle Flood Alleviation Scheme Mini Competition for Site Engineer Services for River Poddle Flood Alleviation Scheme
Die Stadt Waltrop, kreisangehörige Kommune im Kreis Recklinghausen, NRW, rund 30.000 Einwohner/innen, plant den Neubau einer Feuer- und Rettungswache. Der Rat der Stadt Waltrop hat im Juni 2024 den Beschluss gefasst, den Neubau in der Beschaffungsvariante eines ÖPP-Inhabermodells zu verwirklichen und die Verwaltung beauftragt, die hierfür notwendigen Schritte einzuleiten. Die …
Mini Competition for Site Engineer Services at the Athlone Flood Alleviation Scheme Mini Competition for Site Engineer Services at the Athlone Flood Alleviation Scheme
In summary, the Services comprise Engineering Support to the Networks, Customer Policy and Protection and Security of Supply Divisions. This Competition is divided into 2 (two) Lots as described below: Lot 1: Gas engineering consultancy services Lot 2: Electricity engineering consultancy services In summary, the Services comprise Engineering Support to …
This Competition is divided into 2 (two) Lots as described below: Lot 1: Gas engineering consultancy services Lot 2: Electricity engineering consultancy services This Competition is divided into 2 (two) Lots as described below: Lot 1: Gas engineering consultancy services Lot 2: Electricity engineering consultancy services This Competition is divided …
Seguimiento y vigilancia ambiental de las obras de "Estabilización de las playas de Premìa de Mar a poniente de su puerto (Barcelona)". Fase operacional. Seguimiento y vigilancia ambiental de las obras de "Estabilización de las playas de Premìa de Mar a poniente de su puerto (Barcelona)". Fase operacional.